Step-by-step: Building a prefab house 

Watch how a prefab house is assembled, step-by-step―from the foundation to the final details

Prefab frame

Week 2 

A few days after the slab is poured, the house arrives on a flatbed, and Jones rents a forklift to unload the components. The frame goes up in four days.

NextWeeks 2–8

Prefab concrete foundation

Previous Slide Week 1

Prefab siding

Next Slide Weeks 2–8

2 of 7
Prefab frame